The project:
Our house had no outside shade which made the dining room area and the bedrooms at the back of the house very warm during the summer. There was no privacy from the neighbors when we were outside, and nowhere for a BBQ or entertaining. We decided to construct a patio and shade area along the side of the house, and a shade area across the back of the house.
- Materials:
Upright beams, Metal, 100mm x 100 mm x 3 metres
Beams, treated pine 100mm x 100mm
Metal trusses, 100 mm x 50mm x 2 mm, welded at all joints.
Top Hat, .95 x 64
Colonial gutters
Colonial gutter clips
Roll top ridge capping
Patio tube 76mm x 38mm
Flashings, 300 mm girth
Colorbond in surfmist
Sisilation
Wattyl exterior paint in cream and monument.
Coolaroo shade cloth
Lattice, diamond grey. 2400 x 600
Lattice cream, 1800mm x 600mm
Treated pine beams, 120mm x 35 mm
Concrete, grey general purpose, plus brickies sand and aggregate.
Ceiling batons, 6.1 mtr length.
Storm water pipe 90mm x 6 mtr lengths, plus elbows and junctions
solargard Corrugated Diff Grey 8 mtr length
Bremick, tek screws, wood screws,
Joist hangers, 35mm x 120mm
Stainless steel wire, S/S eyebolt, S/S turnbuckles
Hexagon Bolts and nuts Galvanized, 13mm x 120mm
Metal stirrups
- Tools:
Max Duty digger, with post hole attachment and lifting attachment.
Mig welder
Cement mixer
Post hole shovel
Long handle shovel
square mouth shovel
Trogan 254mm tamper
Makita Mitre Saw
Makita 1/2 Inch drill cordless
Makita angle grinder, cordless
Makita tek gun, cordless'
Makita Drop saw
Wheelbarrow
Concrete float and finishing tool
rake
Tradelite ladder Dual purpose from Bunnings
Extending ladder
Rachet spanner
Clamps
Automatic Laser level
Stanley Level
Assorted paint bruses
Stanley tape measure
Rope
scissors
Stanley knife
Cleaning cloths
Turpentine
- Step 1:
The open carport was enclosed first. 80mm x 30 mm frame constructed in treated pine wood for the opening. Finished in Hardiflex and a 720 door and lock installed.
- Step 2:
The Patio was the next thing to be constucted. The original paving bricks were left in place,
After many, days and a lot of graph paper, I finally had suitable plans ready to submit to the Shire. These were approved within the month, and we commenced work on the new patio.
Holes were dug, 500mm x 500mm along the side of the house and the outside edge of the proposed patio area. This had to be done by hand and was difficult as this is a high clay area. Concrete was mixed, grey cement, sand and aggregate mix, and the holes filled. weldmesh was added for re-enforcement. Metal stirrups were put into position in the concrete. to hold the uprights.
Metal Uprights, 100mm x 100mms, were cut to size and the bends measured and cut for along the house side were welded into place on the uprights. We chose to construct the beams in the shape so they could be fixed to the brick wall and not protrude out into the patio area. The beams were cleaned with Turpentine, undercoated, the painted with 2 coats of cream wattyl solagard paint. Around 150mm of the top of the upright was left un-painted. This was so the trusses could be welded in place once the trusses were inplace. A "U" shape was cut into the top of the uprights so that the Trusses could slot into them and remain secure.
Once everything was dry, the posts were moved into place. The posts were fitted to the metal stirrups at the bottom with 120mm hex bolts and nuts. The posts along the wall were also anchored to the bricks with bolts and loctite. The outside poles were supported with braces until They were secure.
Trusses were then cut to size and welded together. They were cleaned, undercoated and painted. A gap was left in the painting so the uprights could be welded into position in the U cutout.. These areas were painted once the everything was welded together.
The trusses were lifted up using the dingo machine with a home made bar attached to the front, and with the use of a second attached rope, pulled slowly into position. This was a very tricky endevour, but we got it done eventually.
- Step 3:
Once all trusses were in place and secure, they were welded to the uprights. The tophat went up next which secured the frame together.
The sisilation was installed over the top hat and fixed to the beams. It was joined with tape to stop it moving in the breeze.
The roof of surfmist colorbond was installed and fixed with roofing tek screws.
Colonial gutters were added along both long sides of the patio using gutters clips.
The patio roof overhangs the house roof which stops water flowing off the roof and into the patio area.
- Step 4:
A storm water pipe was attached to the gutter on the house side of the patio. This was run along the back end and joined up with the gutter on the outside. It was then connected into a downpipe, laid in a trench dug across to the side fence, and plumbed into the existing stormwater pipe.
- Step 5:
The rear of the patio near the top was filled in with some leftover colorbond and painted in the monument colour, as was the stormwater pipe across the back. This made it almost impossible to see. A lovely metal ornament of a parrot was added for interest. This was also found in bunnings.
Two lengths of patio tube, 75mm x 38mm were added along the outside edge of the patio, 50 mm down from the top, and another 125mm, underneath the first piece.
Grey Lattice was installed along the length, and across the back as a feature. Two uprights in patio tube was added to the side wall where the bbq was to be situated. These were fixed to the Patio pavers and cream lattice was installed, along with 2 small wooden planks as the lattice wasn't quite long enough. This gives the area some protection from the weather. A similar piece of lattice was installed at the other end to provide protection from the weather. All wood was painted in wattyl solargard cream paint.
- Step 6:
The large shade area was started next. This measures 2.28 wide x 10.8 long. All the lawn was removed and given to friends in a new house so they could get some ground cover happening. We used the dingo machine with the bucket attachment for the major part of the removal, and hand dug the trickier pieces.
The length of the shade aera was measured using the stanley tape, and the distance divided to give us the position of the holes.
The holes for the uprights were dug by hand as it was to close to the fence to use the machine.
The uprights, 100mm x 100mm treated pine, were all painted in monument, with the bottom 100mm done with bitumin paint to stop rotting. Concrete was poured and the poles installed.
These were held in place with braces until the concrete set. All poles were leveled using the hand level.
Facia beams and cross beams in treated pine are 120mm x 45mm. All timber is painted in solargard monument. All beams are fastened in place using joist hangers. Once all the beams were in place, the metal ceiling batons were laid lengthways across the top of the structure in 4 rows of equal distance. The coolaroo shadecloth was stretched across the top of the batons. This was pulled tight and another ceiling baton laid over the first one. This was screwed into place securing the shadecloth, and fixing it all to the beams. This ensured that the cloth stayed in place and couldnt move in the wind.
The shadecloth was pulled over the side and fixed near the top of the side fence, which gives us privacy from the neighbours.
- Step 7:
Across the back of the house which is an area of 1.6mts x 20 mtrs, we used the same materials to create another shade area. Uprights, 100mm x 100mm treated pine, painted in Solagard monument and concreted into the ground. These holes were hand dug as there is underground drainage in the area and we didn't want to cause any damage. The same beams, 120mm x 45mm, were used in this area as were used in the other shade area as we wanted it to all appear uniform in constructiion.
The facia beams and cross beams went up secured with joist hangers, 120mm x 35mm. The metal ceiling batons were then attached to the beams, and the coolaroo shadecloth was rolled along the top. This was then secured with thew second ceiling baton and all screwed to the beams.
The front edge of the shade cloth was to wide so was cut using a stanley knife and trimmed with scissors whilst standing on a ladder.
Where the back shade area meets the patio area, we used Solargard corrugated Diff grey panels. A piece of top hat was used in the middle to provide some stability and give us somewhere to secure the roof. It was secured using roofing tek screws. We decided to add the solid cover at the end of the patio to stop water from coming into the patio area.
The back shade area continued across to the side fence. To avoid having to put another upright in the area near the patio, we used a cantilever beam instead. This leaves the side area open so we can drive through there if necessary. The last piece of the shade cloth roof area has a slight dip in it which allows any fast-flowing water to run off.
- Step 8:
Across the back we ran 4 strands of stainless-steel wire secured with eyebolts and turnbuckles. This structure supports 2 passionfruit vines. This will also provide extra shade for the bedrooms.
The ground in both of the shade areas was then covered 5mm deep in small size crushed limestone.
Whilst the limestone for the large area could be carted in with the digga machine, all the back area was done using the wheelbarrow. It was all raked and levelled by hand, then compacted with a hand tamper.
- Step 9:
To finish the area we raided Bunnings for plants and outdoor furniture. We found and outdoor lounge that would fit in the area. Also an lovely stand for plants and ornaments. We re furbished the outdoor table and chairs as it was still in good condition. We now have a lovely outdoor area we can use when the weather is hot, and it also keeps the inside of the house cool.
We ran power from the carport to the patio for a fridge and ran overhead lights to the area.
- Step 10:
Unfortunately, I didn't take photos of the area before we started. This is the best I could do. It's a photo from the advertisement forwhen we bought the house. This gives you an idea of just how much work went into this project.
As this photo shows, there was only a wire fence here when we bought the house. The first Thing we did was install a colorbond fence around the property.
We are now looking at finishing renovating the inside of the house.