Hi there
As part of my ongoing laundry reno, I will soon be patching a hole to then tile a splashback.
On the patching process, are the timber studs there sufficient or are extra needed?
Also, should I cut one piece that fits both sections or make two separate pieces?
Existing plaster is 10mm so was thinking something like this given I don't need too much. And also using these screws
I assume I then put the tape over the joints and plaster over the whole area similar to this video
Is there anything else I'm missing?
On tiling, is there anything I should be doing to the surface once I've filled the holes?
I will be using these subway tiles - the box says to allow a minimum of 1.5-3mm joint for wall tiles but also says 3-5mm for glazed and unglazed wall tiles - I am unsure if these are glazed? I was thinking of a 3mm gap which seems to cover all bases. I think I understand the tiling process using tile wedges and spacers but I was wondering about how to tile the corner - do I just leave a 3mm gap on both sides of the wall then silicone down the joint? Or will the gap need to be bigger?
Thanks