Hi there,
I've just finished pulling up tiles on my bathroom floor. They were stuck down with chicken wire and cement which was more than an inch thick. I'm now back to floorboards that have been patched here and there. I'm just wanting to clarify exactly what materials I need now to get the floor ready for tile laying. I have a gap now from the floor to the bottom wall tile of 30mm so I'm thinking of using yellow tongue and cement sheet under to tiles to build up the flooring. What other materials do I need? Also will it need waterproofing as it's not the shower area?
Thanks in advance. 🙂