I've removed an old bathtub that had been bedded into a mound of concrete. I've ground down the concrete mound and want to repair the concrete floor and old walls. Questions: Do I need to grind the concrete down completely to the level of the surrounding floor? Can I lay new concrete directly over the old concrete? If so, does there need to be some sort of reinforcement?
Can I move the bathtub waste and the taps to the other end of the space? Would that be difficult?
The old bathtub waste, which joins shower waste.
The lumpy slab and old tiles.
The lumpy slab and old tiles. Slab 2-4 cm below tiled floor.cm.
The rim of the bath was inserted into the wall.