Bessa blocks, using these to retain soil prior to laying turf on quite a sloping area. do i need to use metal rods ( reinforcement) to marry the 2 levels of blocks! length is approx 15 meters. Also what about the mortar, how deep for the footing & what mix for the blocks? thanks in anticipation of an answer