I've hear conflicting stories on this, so need advice from locals.
I've recently removed a bathtub and had the plumbing capped, and now need to fill the void with concrete. The area to fill is small, just 1.4m x .85m and after compacting it will be around 10cm deep.

My plan is to concrete up to about 10mm short of the height of the existing tiles, and and then use levelling compound for the remainder so it's as close as possible to the existing floor (and then extend the existing tiling).

My question is: Do I really need to mesh or rebar first? Some forums say yes, some say no if the area is small.