An old laundry has been converted to a bedroom but the concrete floor level is not much above outdoor grass level and in heavy rain water has entered the room and rotted the bottom of the wall frame . I'm going to work on lowering the outside level to help water flow away from the room.
What I really want to do is lift the bottom of the walls and maybe concrete 100mm on top of the existing concrete floor. The room is approximately 3mx2m. How do I concrete a new floor then have the existing walls shortened at the bottom to sit on the new floor ?