I’m starting to plan for a full bathroom make over ,but I’ve never done one before. I have a little experience in framing and plastering, but with this project I will try a few new skill sets on..
First question is, as I’m planning on decommissioning the current old shower stall, and installing a new walk in shower on the other side of the room, can I just remove the whole shower pan down to the floor board without any issues? It’s a 1980 vintage 3 panel glass door type affair with a raised tiled base
My initial plan is to do as much of the grunt work myself ( the demolishing) and prep work ( possibly including water proofing ) and have all the work area ready for the Electricals and plumbing to be roughed in by Tradies as required . Tiling would be done by a Pro, but sourcing the fittings and tiles would be up to me .
So what lessons and pitfalls should I be aware of going forward … ?