Hi everyone,
I have just had the screed layer removed from the bathroom floor and will be getting a concreter to come and pour the new bathroom floor which will then be sealed and used as a concrete floor and shower base without any tile. Can you please advise what sort of waterproofing needs to happen around the base of the wall prior to the concrete pour, and/or afterwards. Does some sort of waterproof membrane need to be laid and extend up the walls before the concrete goes in? The grey section along the edges is a very hard plastic that was the edge under the screed. Thanks.
