Hi All,
Im in the process of renovating my laundry room and would like to do all the preparation work for the plumber to eventually do. I need to cut the subfloor to open it up for the plumber but im worried I may not be able to just cut a small section without having to replace the whole floor. So the question is it is possible to cut out a small section of the floor and also replace that with an equivalent after the work has bern completed. Or will i have to remove the whole subfloor for the room?
Intent is to get the plumber to connect the floor waste to the laundry sink waste. So if the washing machine leaks or anything there is somewhere for the water to go.

