Hi, I have a 6mx4m double shed with steel frame.
I am slowly setting it up as a gym space and want to hang a 6ft heavy bag approximately 50kg from the ceiling.
I also have a TRX mount that I also want to hang from the ceiling.
I'm happy to add framing to the ceiling.
I want to maintain the structural integrity of the shed while being able to hang both items.
I am looking to use this mounting piece door the heavy bag
https://meisterelite.com/products/meister-250lb-heavy-bag-ceiling-hanger-mount?pr_prod_strat=e5_desc&pr_rec_id=c2f8e8bc7&pr_rec_pid=6803508658349&pr_ref_pid=7824168386801&pr_seq=uniform
I was also thinking of adding a spring between the bag and the mounting point to reduce vibration.
I've seen other posts stating adding wood into the C channel beam and then bolts through to that to share the load.
Ultimately I just don't want the shed to fall over so structural integrity is my main goal.
As for mounting location I was either thinking in the C channel beam in the middle or adding additional framing in the back half of the roof.