Hi everyone!
I am looking for some advice if I need to add more soil to level my backyard before building a deck to enable access from the house.
In the picture below, after the deck, there will still be about 1.5m or so towards the fence which I would have to raise the Ground to be level.
However,if I am putting a deck,should I still raise the Ground under the deck because it would make a big difference as to how much soil I need.
Many thanks in advance