hi everyone, question - we have a slopping block front to back (1-1.5m drop over 29m) and am wondering if we need to install agi pipe next to the concrete all along this path terminating into storm water drain?
In the backyard we’ll have an area that will have grass with a slight slope, does this area also need agi pipe?
soil is clay


