Materials
Porters Paints Riverstone
Black gloss marble tiles
Arlec dotless LED Tape
3m Scotchblue Tape
CSR gyprock
Lifx Smartlights and switch
HPM Vivo switches
SIKA silicone, gap filler and liquid nails
Tools
Dewalt: Drills, Circular saws, Reciprocating saw, sander, router, table saw, grinders, multi tool
Paslode Framing and Trim nailer
Festool Mitre saw, Domino and vacuum
Steps
Step 1
Demolish old kitchen cabinets

Step 2
Remove old wall coverings (tiling, gyprock) and insulation. Run new power lines and plumbing

Step 3
Install new insulation and gyprock. Joint, sand, repeat

Step 4
Prime gyprock, install new door and window trim and custom cornice for LED Lighting

Step 5
Paint areas of walls that will be exposed (no tile or cabinets) and install upper cabinets

Step 6
Install lower cabinets, bench tops and finish painting trim etc ready for tiling

Step 7
Tile backsplash

Step 8
Install appliances and cupboard doors etc

Step 9
Custom wall LED lights, under cabinet lights, handles, tap, silicone, rollerblinds, filler covers between cabinets

Step 10
Upper and lower trim on wall cabinets. Skirting boards, feature wall, custom utensil cabinet
