Hello, I am looking at installing floor select hybrid 6mm blackbutt hybrid boards in my Kitchen and living rom area as they are one larger area.
a) Can you install the boards first then Kitchen Cabinets on top?
I am guessing not as I assume the floor won't be able to float however looking for your suggestions.
b) The boards will be installed on yellow tongue particle board is there any suggestions for a underlay or similar considering the boards already have a rubber backing?
c) Any other tips or tricks when laying?
Thank you in advance.