I remove concrete and tile flooring that was done over floorboards due to water damage. The floorboards have been repaired and I need to build up the flooring to 25mm to match the rest of the house. I have 5.5mm hybrid floorboard, 2.5mm vapour barrier/acoustic underlay. I am thinking the best option is yellow tongue boards ontop of the original old floorboards, and then using a dry seal (wedi) layer to "waterproof" the yellow tongue, then the vapour barrier/acoustic underlay, then the hybrid flooring. Not sure if the wedi dry seal an be used on yellow tongue or if there is another option. Am taking this extra precaution as I have had water damage to flooring and want to avoid this in future. Would appreciate any advise