Looking to backfill my trench but not 100% sure on best practice. It goes from 500mmm depth from one end to 1.6m depth the other over a 17m run. The trench I've dug is approx 600mm wide. I want to use two rows of agi socked or unsocked with 10mm aggregate around it and then wrapped with geotech fabric for the first 400mm and then top soil the trench. Is top soil a suitable backfill soil even though one end of the trench is 1.6m in depth? It was originally heavy clay soil. Do I need to add drainage? I've sealed the brick work etc which is stopping the water ingress underneath my home which is great.


Any advice would be appreciated.....