Hi All,
I m planning to build deck in a concreate floor small area (3m x 2.6m). I am kind of new for decking projects. I want to use ecodeck boards which has 23mm thickness. The problem I have is that the clearence to build deck is only 100mm. So with the board thickness taken away I have only 77mm left.
For framing the only option I can think of is 70mm x 45mm framing treated pine H3 (are there joist hanger available for 70 x 45 timber?).
What should I do to prevent the frame from decaying as the frames will be touching the concrete floor?