I want to set a 50mm SHS fence post beside the high side of a limestone retaining wall, but there is a footing course only 350mm down. The post will be side loaded so needs to be fairly strong, so I was thinking of somehow setting it into the footing course and concreting above that to ground level, but have no idea if this can be done without specialised tools, or if these can be hired?