Your deck has come up looking amazing mate. Well done on the work.I am soon to be kicking off something similar for myself with an insulated Patio kit ...

shauny
Building a Reputation
1 reply
July

Hi @Mizzms what did you draw your deck plan up in? II absolutely recommend weed matting at a minimum for your design.

shauny
Building a Reputation
1 reply
September 2021

I am no expert Imesh, but it looks like your post placement currently matches with the joins of different sections of beams? Which means you would nee ...

shauny
Building a Reputation
September 2021

@Backyardtradie Your picture framing, is it a 140mm board, with a board laying on its side with an additional 19mm space before your normal decking bo ...

shauny
Building a Reputation
September 2021

Not a huge amount of clearance over soil. I would dig it out a little if it was me. Then Couple of shovel loads of gravel down, compact it and level ...

shauny
Building a Reputation
3 replies
September 2021

@Caz11 you want these adjustable joist supports which are available via the specialorders desk. Have a read of the Klevaklip website though, very good ...

shauny
Building a Reputation
3 replies
September 2021

Hey Matt,How much ground clearance from the top of the old patio to the ground do you have?

shauny
Building a Reputation
8 replies
September 2021

Oh, that is a good space for a low level deck. You would do fine with using something like the Klevaklip Adjustable Joist supports along your joists.I ...

Posts user liked

Bunnings Team Member MitchellMc
Bunnings Team Member
15 replies
a month ago

Hi @IronStan001, If you want to skip the natural several-week weathering process, I'd recommend you scrub it down with Cabot's 2L New Timber Prep. I ...

IronStan001
Having an Impact
17 replies
March

It's strange, because aside from the odd minor bend here or there, the boards were pretty straight. None of the boards I don't think we're installed ...

IronStan001
Having an Impact
19 replies
March

@shauny I use SketchUp. I transposed my entire block and the house from plans into SketchUp. What I have in SketchUp is mm perfect, so I know what ...

Bunnings Team Member EricL
Bunnings Team Member
September 2021

Hello @Glynn23 Welcome to the Bunnings Workshop community. It's great to have you join us, and thank you for sharing your question about building ...

Imesh
Growing in Experience
5 replies
September 2021

Thanks @EricL @TedBear @shauny I think i forgot to mention a crucial part, that im removing the existing structure and building everything from scratc ...

TedBear
Kind of a Big Deal
6 replies
September 2021

I support the views of both @shauny and @EricL on this. It is not only weight distribution to consider but also wind loading. With too few posts a st ...

Glynn23
Just Starting Out
1 reply

Hi Everyone,I am currently planning my first deck.After reading lots of posts on this page and other forums I have put together my plans and wanted so ...

Caz11
Getting Established
4 replies
September 2021

@shauny I just found a merbau klevaklip mt90g but cant seem to find them at bunnings, is this what you were referring to? or do you mean the clips th ...

User's liked posts

shauny
Building a Reputation
20 replies
March

Your deck has come up looking amazing mate. Well done on the work.I am soon to be kicking off something similar for myself with an insulated Patio kit ...

shauny
Building a Reputation
1 reply
July

Hi @Mizzms what did you draw your deck plan up in? II absolutely recommend weed matting at a minimum for your design.

shauny
Building a Reputation
1 reply
September 2021

I am no expert Imesh, but it looks like your post placement currently matches with the joins of different sections of beams? Which means you would nee ...

shauny
Building a Reputation
September 2021

Not a huge amount of clearance over soil. I would dig it out a little if it was me. Then Couple of shovel loads of gravel down, compact it and level ...

shauny
Building a Reputation
3 replies
September 2021

@Caz11 you want these adjustable joist supports which are available via the specialorders desk. Have a read of the Klevaklip website though, very good ...

shauny
Building a Reputation
3 replies
September 2021

Hey Matt,How much ground clearance from the top of the old patio to the ground do you have?

shauny
Building a Reputation
8 replies
September 2021

Oh, that is a good space for a low level deck. You would do fine with using something like the Klevaklip Adjustable Joist supports along your joists.I ...

shauny
Building a Reputation
1 reply
September 2021

I don't see much I would do with it other than removing the trellis on the front which is a bit old looking to me.I guess the real question is, do you ...

shauny's Bookmarks
No posts to display.
Contact Me
Online Status
Online
Date Last Visited
2 hours ago