Hi everyone,
just want to update with our latest progress, we are working with our plumber to install 3 drainage pits and some capiphon belts
but we will be responsible for excavation (30cm depth) before the plumber install the pipes
we have a few large chunk of concrete left by previous owner buried underground and our rotary hammer is simply not powerful enough
https://www.bunnings.com.au/ryobi-1500w-sds-rotary-hammer-drill_p0013582?region_id=118018&gclid=CjwKCAjwvsqZBhAlEiwAqAHElXwOV5eycnIwepTf5OvTqr4DKjolnyH7ez2pXm6OreIxqfoTDP6h2BoCkrcQAvD_BwE&gclsrc=aw.ds
is there any portable equipment we can rent from bunnings ?
___________
2)We have digged out a lot of clay soil with rocks and are planning to backfill the trench with better soil after the pipe installation
But last time when we went to landscape company to buy soil for installing turf, the staff asked us to elaborate what soil we exactly wanted and told us its called "topsoil"
So, what is the type of soil we need to buy this time for backfilling a 30mm trench? what is it called?
Thank you for any ideas