The concreter left us with the alfresco lower than the concretr perimeter.
Now, we want to get someone to put tiles over the alfresco. Based on my research, I need to put concrete over the alfresco for it to be levelled with the perimeter concrete. Questions are:
1. is it fine to have the new concrete levelled with the perimeter? Or do I need to have it lower? Like 10-20mm.
2. How do people usually do it? Tiles higher that the perimeter (i.e. almost levelled with the entrance) or same level with the perimeter?