Hi all. I have the side of my house to pave. i have a 30cm gravel zone from the house that must remain for termite inspection. this leaves a 130cm gap between the edge of gravel and a retaining wall approx 50 cm high. i intend to pave.
the area will be clear to allow a 7.5 cm gap below hte weep hole to the top of the paver, below the paver will be 7 cm of road base and 3 cm sand base. i know i need a 1to 2 degree drop for run off (approx 1-2cm over a meter). i also am aware that i need to have run off from both the house and the retaining wall to a center line drain.
My concern is that over such a small distance of 130cm (meaning only 65cm of each side of the center drain) it is difficult to get run off in both directions to the center line using even relatively narrow pavers of 20cm.
Can i slope the road base at 1cm drop and have the sand level thus the top of the pavers will be level? the variation of sand will only be 2.5 to a max depth of 3cm.
Any ideas would be welcome.