Hi there,
I’m intending on building a deck this summer.
Decided to use tuff blocks instead of concrete footings because it’s next to the house and to save digging (can’t use a ledger board because that would require an engineer).
The posts will be 100x100, the joists and bearers will be 140x45, some bearers will be doubled up. And one bearer is 190x45 to account for the deck step up. Overall the deck will be 2.6m deep by 7.09m long on ground that slopes away from the house and down hill.
I’ve followed span tables, and erred on the side of over engineering with the exception of my joist over hang near the concrete stoop being the max allowed cantilever due to needing the following bearer to bypass the drain. Will be getting a plumber in to reroute all the pipes shown in the picture and hopefully they will make a smaller drain (current drain shown in red on the plans atm).
There are two aspects of the deck I’m unsure about.
Here, because these are essentially noggins, do they even need to be at the end of the joists? Could they be staggered like normal noggins? And then the fascia boards would just get attached on to the end of the joists?
Or, should I be putting a continuous board on the outside of all the joists instead? A rim band joist and attach the structural joists to it with hangers?
I’ve seen many solutions, but what’s best?
For my single bearers, I intend to notch the posts and bolt them (fully housed). But for my 3x double bearers, I had initially planned to nail laminate them, place them on directly on top of the posts, and use strapping like on the Bunnings tutorial: How to build a deck.
However, I’ve read maybe this isn’t ideal? Plus these posts straps would then interfere with the identified joists. Meaning I’d either have to move the posts, remove the central posts altogether, or find a better way to attach.
I’ve seen a range of options, but not sure what’s best or what Bunnings carries.
Hearing any issues you spot I’ve overlooked would also be appreciated!
For fasteners/ metal plates etc, I currently have 30 x VUEPRO galvanised joist hangers for 45x140, but everything else I’ll still need to buy.
Should I attach the hangers with screws or nails? Should I buy a palm nailer?
Thanks in advance :)