In January 2020, I had the slab laid for my shed. The intention was to have my mates help me get this built over the next 12 months.
I had a big delivery of the steel, timber, and roof sheets turned up in early March, and I was ready to go. Then Covid happened, and I ended up having to do it all myself, except for the plumbing and electrical.
It took 2 and a bit years, but I got there.
I did a test fit to make sure there were no surprises once I was assembling it on the posts. Each of the black rafters was 120kg
With the frame up and the roof on it was time to clad the outside.
Finally finished and ready to start getting stuck into some projects.
I can avoid having to go inside dirty and dusty.
I'm looking forward to working in this space and getting stuck into the projects I promised I'd get done once I had a shed.