G'Day All ,
I am looking to build a low level deck to join a shed , patio and bedroom
Structures are 100mm,150mm, 130mm above ground, so all relativity close in height.
The plan is for excavation and concrete poured then deck added on top - but I wasn't sure what I needed to ask for excavation depth wise to the concreters? ie finished slab height
Just looking for some info so I can have an informed discussion with the concreters