The project
Our boys had outgrown their old rooms. We wanted to create a new fun room with their favourite characters.
Both rooms were mirror imaged to one another.
Steps
Step 1
Step one was to measure and draw up the plans and work out how many sheets of MDF we required for the each room.
![20230312_100128[1].jpg 20230312_100128[1].jpg](https://us.v-cdn.net/6038643/uploads/migrated-attachments/81d47ffe0acf573ac1fe6bcd9edb9d6a.jpg)
Step 2
Picked up our materials from our local Bunnings store.
![20230312_100719[1].jpg 20230312_100719[1].jpg](https://us.v-cdn.net/6038643/uploads/migrated-attachments/ffb69080f8c9d00b5f1e9367cdadc6fc.jpg)
Step 3
Started to cut the MDF to the measurements we had drawn up, so we had all the cut pieces required ready to assemble.
![20230312_114204[1].jpg 20230312_114204[1].jpg](https://us.v-cdn.net/6038643/uploads/migrated-attachments/3b673cc6f011dd7b30e4a18fe1c58c44.jpg)
![20230313_132211[1].jpg 20230313_132211[1].jpg](https://us.v-cdn.net/6038643/uploads/migrated-attachments/70dc9cf89e35b72f81cef168aff170b4.jpg)
Step 4
Started to assemble the first bedroom in the garage, and used glue to glue up all the required sections. Used the air compressor with brad nailer to fix the shelving units to the backing and sides. Used a set square to ensure all the levels were even. Putty on all brad nails. Sanded after putty dried with 240 grit and orbital sander.
![20230313_142822[1].jpg 20230313_142822[1].jpg](https://us.v-cdn.net/6038643/uploads/migrated-attachments/89cc41acbb2d3564d03f06484078783e.jpg)
![20230313_143451[1].jpg 20230313_143451[1].jpg](https://us.v-cdn.net/6038643/uploads/migrated-attachments/333b2c94f0684af8aed00df908644af8.jpg)
![20230318_143940[1].jpg 20230318_143940[1].jpg](https://us.v-cdn.net/6038643/uploads/migrated-attachments/7a548c80e3dd70ec79fee3980d369d4c.jpg)
![20230401_173101[1].jpg 20230401_173101[1].jpg](https://us.v-cdn.net/6038643/uploads/migrated-attachments/81a22e06f97be52e9d6a1c8d00eb50e9.jpg)
Step 5
Primed the shelving units and the bulk heads. Painted them in Dulux white paint once the primer was dried.
Step 6
Measured, cut and installed timber battens, on the upright of the wall, to timber studs. We used the French cleat method. Used 100mm wide onto the wall and 50mm onto the back of the bulk head. Then install the RGB LED lighting trip to the edge. We recessed the LED back 70mm from the end finished size of the units to give a halo glow once everything was installed.
![20230521_130545[1].jpg 20230521_130545[1].jpg](https://us.v-cdn.net/6038643/uploads/migrated-attachments/435bc5072b960d2e7333473ea445572f.jpg)
![20230514_174911[1].jpg 20230514_174911[1].jpg](https://us.v-cdn.net/6038643/uploads/migrated-attachments/31500cabecb788ec64527d448a23ffc8.jpg)
Step 7
Installed the shelving units against the battens with screws and levelled (did not take pictures during these steps).
Installed the bulk head on the French cleat onto the wall. Screwed off the bulk head on either side to give extra support.
Step 8
The final stage was to touch up any paint where required, and then set up the decor in their rooms.
![20230521_191756[1].jpg 20230521_191756[1].jpg](https://us.v-cdn.net/6038643/uploads/migrated-attachments/05224b420b0314036761684f4fbad3c1.jpg)
![20230521_191735[1].jpg 20230521_191735[1].jpg](https://us.v-cdn.net/6038643/uploads/migrated-attachments/f6fae12562c31c621a1e47a41711d909.jpg)
![20230521_191640[1].jpg 20230521_191640[1].jpg](https://us.v-cdn.net/6038643/uploads/migrated-attachments/363f476ba03045028f808c165e0c13d7.jpg)
![20230507_131711[1].jpg 20230507_131711[1].jpg](https://us.v-cdn.net/6038643/uploads/migrated-attachments/b8e0dd7eb8d29119b12542631ae788f5.jpg)
![20230521_191631[1].jpg 20230521_191631[1].jpg](https://us.v-cdn.net/6038643/uploads/migrated-attachments/267014e1194c74f47077bd842b2df91b.jpg)
![20230507_174256[1].jpg 20230507_174256[1].jpg](https://us.v-cdn.net/6038643/uploads/migrated-attachments/228e3f1df7a749c901cb77ea5304d6ef.jpg)