I live in an area short of tradies in normal times. I have bought a property and will build a home when builders have time. There is a shed already on it that someone else has given up on. Photos attached.
The shire have approved temp accom only, due to septic, electrical and water tank and filters attached to shed.
The shed has a bathroom and toilet, but i suspect inaccurate waterproofing but will have to tackle that redo later.
I have to live in it as of nxt wk. I have tried getting assistance from the closest bunnings store for cheapest option for insulating shed properly. Helpful (said sarcastically) people have told me the existing R2 piles left in shed wont be enough but no advice on what will be.
There's a tin ceiling put in what was going to be the bed and open plan living, this appears to have already had the R2 put in place. The walls have nothing on them altho frame work at 450mm appears done, no sarking on walls altho does appear on the tin roof inside.
Hot and cold water taps appear to be where they were going to put kitchen sink thru shed wall.. I'm trying not to get pneumonia again during this process. My urgency is get 1 wall complete with what? So i can find a split sytem installer asap and have it working overtime while i tackle the rest. Help please! Any advice is something ill throw around to my capabilities and availabilities.
Sick of standing in bunnings with blank looking staff or they say they'll be back an don't return. 3hr drives wasted many times.