How I made steps for my frontyard
Frontyard Timber Steps and garden makeover. Relatively steep slope, was difficult to mow lawn. Had quotes for concrete steps which were astronomical. I decided to try my hand at steps and the project evolved from there. Used 75mm sienna sleepers from Bunnings for longevity and strength.
-
Split-level deck as a sauna base
Cantilevered 2 level deck for saunaI needed a steady and level base for my kit sauna that allowed drainage and could hold 650kg Steps Step 1 I needed a base for a kit sauna My backyard has a considerable slope I decided to build a 2 level deck to manage the slope The dimensions mirrored what I needed as the base for the…
-
Steep front yard makeover
New steps using timber sleepers and granite pavers as well as new garden beds helped transform a steep front garden that was hard to mow. The project We have a relatively steep slope at the front, which made it difficult to mow the lawn. We got quotes for concrete steps, but they were astronomical. I decided to try my hand…