• Whole of House
  • Kitchen
  • Bathroom and Laundry
  • Living and Bedroom
  • Garage and Shed
  • Outdoor
  • Garden
  • Featured Projects
  • How To
  • Top Ideas
  • Best Advice
  • About Us
Workshop
cancel
Turn on suggestions
Auto-suggest helps you quickly narrow down your search results by suggesting possible matches as you type.
Showing results for 
Search instead for 
Did you mean: 
Ask a question
Share a project
Sign in
Join Workshop
  • Bunnings Workshop
  • >
  • Albums for Community
  • >
  • Images in Profile (MitchellMc)
  • >
  • My Images for MitchellMc

My Images for MitchellMc

My Images for MitchellMc

  • Albums
  • All images
Image Options
  • Flag Image for Review
  • Bookmark
  • Subscribe to RSS Feed

Album: Profile (MitchellMc)

by Bunnings Team Member MitchellMc
2.1 Select a sturdy base pallet with minimal damage..jpg
3.1 Use a pinch bar to remove boards..jpg
3.3 Mark the height of runner..jpg
3.4 Countersink holes for coach screws..jpg
3.2 First board removed..jpg
3.5 Pre-drill timber for coach screws..jpg
3.7 Fix upright posts into place..jpg
3.6 Check the upright post is straight before fixing..jpg
3.8 Fixed upright post..jpg
4.2 Pre-drill holes in blocks..jpg
4.1 Mark height of runner..jpg
4.4 First board screwed down..jpg
4.3 Blocks installed..jpg
4.6 Continue down the pallet..jpg
4.8 Completed floor..jpg
4.7 Fill gaps on outside of posts..jpg
4.5 Remove boards in the wrong place as you lay new boards..jpg
5.1 Measuring distance between uprights..jpg
5.3 Screw at a 45-degree angle from the top and below..jpg
5.2 Install horizontal beams..jpg
5.4 Two horizontals joined to a vertical post..jpg
6.4 Screw roof supports into upright posts..jpg
6.3 Pre-drill holes in roof supports to fix into vertical posts..jpg
6.1 A 45-degree cut on one end of the roof supports..jpg
6.2 Pre-drill holes in the 45-degree join..jpg
6.5 Roof supports in position..jpg
7.1 Cut to length and position upright division board..jpg
7.2 Screw into position top and bottom..jpg
7.4 Create a side-door division..jpg
7.3 Fix a horizontal board to create windon division..jpg
8.2 Boards meeting in the corners..jpg
8.1 Start at the bottom fixing boards into place..jpg
8.4 Cut boards flush with frame..jpg
8.3 Over-hang of boards..jpg
9.1 Begin laying roof boards..jpg
9.2 Cover roof with boards..jpg
9.4 Add final finishing board..jpg
9.3 Cut roof support beam to length..jpg
10.1 Measure from under the pitch of the roof to the bottom of the horzontal beam..jpg
10.2 Cut the middle board..jpg
10.3 Start placing board working outwards..jpg
10.4 Finished rear roof..jpg
10.5 Finished roof front..jpg
11.3 Pre-drill four upright posts..jpg
11.1 Pallet for shop base..jpg
11.2 Remove the first board with a pinch bar..jpg
11.4 Install posts onto base..jpg
11.5 Create blocks for the first board to secure to..jpg
12.1 Measure distance between uprights..jpg
12.3 Four beams fitting in position..jpg
6.3 Pre-drill holes in roof supports to fix into vertical posts..jpg
Previous
6.3 Pre-drill holes in roof supports to fix into vertical posts..jpg
Next
Added May 2020
0 Likes
Like
Posted in: How to build a pallet cubby - ( May 2020 )

You must be a registered user to add a comment on this image. If you've already registered, please log in. If you haven't registered yet, please register and log in.

  • Comment
Workshop Resources
  • Contact Us
  • Rules of participation
  • Terms of use
  • Privacy
  • Workshop help
Our Sites
  • Bunnings Australia
  • Bunnings New Zealand
Quick Links
  • Register
  • Sign in
Go to Bunnings