• Whole of House
  • Kitchen
  • Bathroom and Laundry
  • Living and Bedroom
  • Garage and Shed
  • Outdoor
  • Garden
  • Featured Projects
  • How To
  • Top Ideas
  • Best Advice
  • About Us
Workshop
cancel
Turn on suggestions
Auto-suggest helps you quickly narrow down your search results by suggesting possible matches as you type.
Showing results for 
Search instead for 
Did you mean: 
Ask a question
Share a project
Sign in
Join Workshop
  • Bunnings Workshop
  • >
  • Albums for Community
  • >
  • Images in Public (BrettBuilt)
  • >
  • My Images for BrettBuilt

My Images for BrettBuilt

My Images for BrettBuilt

  • Albums
  • All images
Image Options
  • Flag Image for Review
  • Bookmark
  • Subscribe to RSS Feed

Album: Public (BrettBuilt)

by BrettBuilt
319FE998-0464-4F9F-B56B-038C7D96F382.jpeg
Cutting the up didn’t work. Move to plan C
Tiles gone, but so is the wall.
Wall replaced
Tiles added to the new wall!
Success
Here is the original bathroom.
Remove old trim tiles and ceramic towle rail and soap holders etc..
Trim tiles installed - very fidly work.  Will go for a different type of tile next time!
The sheets came like this so I had to slice them up
Replaced the towel rails, soap holders etc with a few spare tiles I had on hand (lucky!)
Removed the old shower screen and set up up a temp shower :)
Did a bit of fixing and waterproofing to finish the shower area.  Replaced the old drain as well
All tiles now in place :)
Remover the old vanity - 15 years of eewww!
Had to remove the floor pipe and have it come out of the wall
Had to cut out the wall in the opposite room to get to relocate the pipe
Pipe in :)
Pipe and floor pipe done - No the new vanity
Replaced the bath and floor wastes while I had access to the crawl space between the floors - Fun job NOT!
New Vanity done :)
New towel rail done :)
New shower head :)
Glass shelf added as well
And a Towel rack
Needed a rest on Xmas day! A jug of Sangria and watching Grand Designs on TV
Go a garden shed for Xmas - Build that on Boxing Day - Man it was a hot day.
The shower screen came today - An hour later and we have a shower :)
Just need to give the bathroom a really good clean and paint the door and trims and it's all done. About $3500 all up. Next up is the hall floors, replace trims/skirts and paint.  Then I move to the big kithen, dining and lounge build downstairs.
The skylight surround needed replacing.
D7A830C7-524A-45CA-BE2B-EED9E8AAD175.jpeg
Previous
Tiles gone, but so is the wall.
Next
Added November 2018
0 Likes
Like
Tiles gone, but so is the wall.
Posted in: Re: Our Renovation Diary - ( November 2018 )

You must be a registered user to add a comment on this image. If you've already registered, please log in. If you haven't registered yet, please register and log in.

  • Comment
Workshop Resources
  • Contact Us
  • Rules of participation
  • Terms of use
  • Privacy
  • Workshop help
Our Sites
  • Bunnings Australia
  • Bunnings New Zealand
Quick Links
  • Register
  • Sign in
Go to Bunnings