Hi, I have just built a deck, and I was wonder if after the merbau decking boards have weathered for 8-12 weeks, should be sanding the decking boards ...
So my house is built a meter or so above street level. The front lawn near the house slightly slopes away, then has a steeper slope near the property ...
Hi, I have a Nexgrill 5 burner BBQ it is connected with a gas hose with pol connector and 5/8 unf on the other end. I wanted to replace with lcc27 c ...
Hi there, I am looking for some advice on a multi-step repair project for my weatherboard house.The Situation:Rotted Plinth & Cavity: A section of the ...
Outdoor garden home made stairs exisiting, need to put in a hand rail. Ground to hard to dig and concrete. Stairs run down a slope, so no danger of fa ...
Hello everyone this is my first post i would like to know if its possible and how much this might cost to build what i have in my poor design that i ...
The galv steel square fencing post 2.4m is listed as "guage 2" must be wrong because that 6.5mm
Is the 2.4m galv. steel fence post strong enough to ...
Hi, thanks for any advice you can give me regarding my project.
I require a lower landing to accommodate some stairs that are to be fitted to an exter ...